181 St. Station Vault, NY, USA




ODB was hired to conduct a structural analysis of two brick subway tunnels in New York City, after a partial collapse of the face bricks. In-house three-dimensional limit analysis software was used to evaluate the load capacity of the tunnels individually and at their intersection, and to evaluate their ability to withstand possible overburden pressures.
Client(s)
- MTA New York City Transit
Engineer(s)
Architect(s)
